FOB
Depend on quantity
1. Choose a size depending on the condition and size of injury.
2. Take splint out from its aluminum packing and soak it in a running water for 5-10 seconds holding
sheer side up.
3. Put splint on a towel, roll it to remove excessive water and to strengthen the adhesion between
x-layers.
4. Put thick fiber surface of splint on the affected part and put an elastic bandage to fix it.
Item No |
Width |
Size |
Packing / Carton |
|
---|---|---|---|---|
S6210 |
2" |
2" x 10" (5cm x 25.5cm) |
5 EA / Box |
8 Boxes / Carton |
S6312 |
3" |
3" x 12" (7.5cm x 30.5cm) |
||
S6335 |
3" |
3" x 35" (7.5cm x 89cm) |
||
S6415 |
4" |
4" x 15" (10cm x 38cm) |
||
S6430 |
4" |
4" x 30" (10cm x 76cm) |
||
S6530 |
5" |
5" x 30" (12.5cm x 76cm) |
||
S6545 |
5" |
5" x 45" (12.5cm x 114cm) |
||
S6645 |
6" |
6" x 45" (15cm x 114cm) |
※ Please contact us for the product other than those standard products.
The person in charge
YOUNG WON AHNAddress
Hwanam Regional Industrial Park 3-8,134,Hwanamgongdan-ro,Seosin-myeon, Hwaseong-si, Gyeonggi-do,Korea (18553)Please enter the text on the left image to prevent automatic input.
0 / 4000