|
||||||||||||||||||
① Don’t mix other things except water for ready-made goods. ② Avoid construction below 3℃. ③ Keep the product in a dry place. ④ Protect from impact, shake before curing the concreted surface. ⑤ Avoid penetration of rain and water within 3 days under construction or after construction. (because of efflorescence resistance or exfoliation of the tile) |
The person in charge
Address
1522-5 SONGJUNG-DONG KANGSU-GU PUSAN KOREA, 부산광역시,Please enter the text on the left image to prevent automatic input.
0 / 4000